DEIR For New Oil Project Proposal Available June 6, 2011 on our Website
The new proposal is much worse then the first one. It puts the project deeper into the Preserve and damages more land then before despite what the City says. The landscape will be forever changed. Please read the New Amended CUP which is for the new Oil Project.
The New Revised DEIR. Released June 6, 2011 @ 5:30 P.M.
0.1 Cover Sheet
0.2 Inside Notebook Cover |
|
0.3 Executive Summary
0.4 Table of Contents
1.0 Introduction |
|
2.0 Project Description
3.0 Cumulative Projects |
|
4.0 Environmental Analysis
4.1 Air Quality |
|
4.2 Biological Resources
4.3 Safety, Risk of Upset and Hazardous Materials |
|
4.4 Geological Resources
4.5 Noise and Vibration |
|
4.6 Esthetics and Visual Resources
4.7 Transportation and Circulation |
|
4.8 Hydrology and Water Resources
4.9 Cultural Resources and Archeology |
|
4.10 Wastewater
4.11 Land use and Policy Consistency |
|
4.12 Fire Protection and Emergency Services
4.13 Public Services and Utilities |
|
4.14 Recreation
4.15 Energy and Mineral Resources |
|
4.16 Environmental Justice
5.0 Alternatives |
|
6.0 Comparison of Proposed Project and Alternatives, Savage Canyon Landfill Site Alternative
7.0 Other CEQA Mandated Sections |
|
8.0 Summary of Mitigation Measures and Mitigation Monitoring Plan
9.0 List of EIR Preparers |
|
10.0 Agencies and Individuals Consulted during EIR Preparation
Appendix A - Project Description and Design Data |
|
Appendix B - Air Emission Calculations
Appendix C - Biological Reports |
|
Appendix D - Risk Assessment Calculations
Appendix E - Traffic Impact Analysis |
|
Appendix F - Cultural Resources Survey Report
Appendix G - Summary of Oil and Gas Regulations in other Southern California Jurisdictions
|
|
Appendix H - Socioeconomics
Appendix I - Notice of Preparation, Scoping Document, Comments and Responses |
|
Appendix J - References
Appendix K - List of Acronyms and Abrbreviations |
|
Appendix L - Soil Engineering and Geology Investigation |
|
_____________________________________________________________________________________________________________________________________
Amended CUP for the New Oil Project |
|
Maps
|
Map of New Oil Site - May 5, 2011 |
|
The pipeline will run through Arroyo Pescadero Trails. See map. |
|